Photo Release: PTTLNG– SPCC Joint Venture signed EPCC Contract of Nong Fab LNG Receiving Terminal Project

ข่าวเศรษฐกิจ Tuesday August 7, 2018 10:28 —PRESS RELEASE LOCAL

Bangkok--7 Aug--PTT Mr. Wirat Uanarumit, Chief Operating Officer, Upstream Petroleum and Gas Business Group, PTT Public Company Limited (4th from right), presided over "The Signing Ceremony of EPCC Contract of Nong Fab LNG Receiving Terminal Project" between PTTLNG and SPCC Joint Venture (Saipem S.A. - CTCI Corporation). The contract was signed by Mr. Chockchai Thanamatee, President, PTT LNG Company Limited (3rd from left), Mr. Rattikool Piyavongwanich, Executive Vice President, Nong Fab LNG Receiving Terminal Project (2nd from left), Mr. Luciano Pagliarani, Head of LNG Project Direction Onshore E&C Division, Saipem S.A. (3rd from right), and Mr.YANG, TSUNG-HSING, President, CTCI Corporation (2nd from right). The LNG terminal will possess an import capacity of 7.5 million tonnes per year, expecting to be finished within 2022. As one of PTT Group's projects that has adopted Integrity Pact since 2017, the procurement processes and the disclosure of important project information are transparent under the observation of independent observers.

เว็บไซต์นี้มีการใช้งานคุกกี้ ศึกษารายละเอียดเพิ่มเติมได้ที่ นโยบายความเป็นส่วนตัว และ ข้อตกลงการใช้บริการ รับทราบ